Skip to main content

Table 28 Error correction model: Sector H - robustness

From: Structural unemployment after the crisis in Austria

  LR SR
L.v −5.12  
  (−1.09)  
Crisis 0.02**  
  (2.32)  
θ   −0.08*
   (−1.78)
L.dU   0.09
   (0.78)
dv   −0.45
   (−1.06)
L.dv   −0.33
   (−0.70)
L2.dv   −0.22
   (−0.48)
L3.dv   −0.57
   (−1.37)
Constant   0.00
   (1.09)
Observations 87  
  1. t-Stats in parentheses; significance: 0.1*, 0.05**, 0.01***