Skip to main content

Table 29 Error correction model: Sector M - robustness

From: Structural unemployment after the crisis in Austria

  LR SR
L.v −5.19  
  (−1.45)  
Crisis 0.01***  
  (2.58)  
θ   −0.05**
   (−2.08)
L.dU   −0.01
   (−0.06)
L2.dU   0.12
   (1.16)
L3.dU   0.23**
   (2.18)
dv   −0.28*
   (−1.70)
L.dv   −0.37**
   (−2.16)
Constant   0.00
   (0.84)
Observations 87  
  1. t-Stats in parentheses; significance: 0.1*, 0.05**, 0.01***