Skip to main content

Table 31 Error correction model: Sector P - robustness

From: Structural unemployment after the crisis in Austria

  LR SR
L.v −1.56  
  (−0.38)  
Crisis 0.01**  
  (2.25)  
θ   −0.04
   (−1.44)
L.dU   −0.09
   (−0.79)
dv   −0.11
   (−0.65)
Constant   0.00
   (1.47)
Observations 89  
  1. t-Stats in parentheses; significance: 0.1*, 0.05**, 0.01***